The Building of BOB Week 1

Daily Updates From The Production Line At Travel Supreme
Click on the picture to enlarge.

Day 5
8/25/03
BOB5.jpg (66298 bytes)
Installing The Skin
BOB5a.jpg (61670 bytes)
Hard At Work
BOB5b.jpg (53059 bytes)
Refrigerator In Place
BOB5c.jpg (43388 bytes)
Bath
BOB5d.jpg (56930 bytes)
Entertainment Center
Day 4
8/22/03
BOB4.jpg (75711 bytes)
More Progress
BOB4a.jpg (68961 bytes)
Wall Ready for Refrigerator
BOB4b.jpg (67634 bytes)
Insulation For End Cap
BOB4c.jpg (77247 bytes)
Water Manifold
Day 3
8/21/03
BOB3.jpg (87070 bytes)
Side Wall Supports Going Up
BOB3a.jpg (83710 bytes)
Ceiling Installed
BOB3b.jpg (52388 bytes)
Bathroom Cabinet and
Shower Installed
BOB3c.jpg (114985 bytes)
Inside Wiring For
Instrument Panel
BOB3d.jpg (81436 bytes)
Roof Supports
Day 2
8/20/03
BOB2.jpg (76696 bytes)
Interior Walls Going Up
BOB2a.jpg (53219 bytes)
Thickness of Floor
BOB2b.jpg (104469 bytes)
Wiring For the
Instrument Panel
Day 1
8/19/03
BOB1.jpg (77968 bytes)
Start of the Process
BOB1a.jpg (106550 bytes)
John's Favorite Part
BOB1b.jpg (86562 bytes)
Lots of Basement Space
BOB1c.jpg (82565 bytes)
Checking It Out
BOB1d.jpg (84023 bytes)
Floor Ready To
Be Installed

 