|
The Building of BOB Week 1
Daily Updates From The
Production Line At Travel Supreme
Click on the picture to enlarge.
Day 5
8/25/03 |

Installing The Skin |

Hard At Work |

Refrigerator In Place |

Bath |

Entertainment Center |
|
|
|
|
|
|
Day 4
8/22/03 |

More Progress |

Wall Ready for Refrigerator |

Insulation For End Cap |

Water Manifold |
|
|
|
|
|
|
|
Day 3
8/21/03 |

Side Wall Supports Going Up |

Ceiling Installed |

Bathroom Cabinet and
Shower Installed |

Inside Wiring For
Instrument Panel |

Roof Supports |
|
|
|
|
|
|
Day 2
8/20/03 |

Interior Walls Going Up |

Thickness of Floor |

Wiring For the
Instrument Panel |
|
|
|
|
|
|
|
|
Day 1
8/19/03 |

Start of the Process |

John's Favorite Part |

Lots of Basement Space |

Checking It Out |

Floor Ready To
Be Installed |
Trips & Travels
Copyright © 2001. All rights reserved.
Revised: March 10, 2005
|